Opens in a new tab
/
/

Lighting & Equipment Upgrades

Modernization

Lighting & Equipment Upgrades

Swapping dated lights and equipment for color LED, variable-speed pumps and app control so the pool is cheaper to run and better to use at night.

CALL 239-321-9788
What it is

Understanding lighting & equipment upgrades

Older pools were built around single-speed pumps and incandescent lights. Both are energy hogs, and the lights burn out on a schedule you can set a calendar by.

An upgrade replaces those with LED fixtures—white or full color—and modern equipment: variable-speed pumps, efficient heaters, and a controller that runs it all from your phone.

Because a renovation already has the pool drained and the pad exposed, it is the cheapest moment to make these changes.

Signs you need it

What homeowners notice

  • Pool light is dim, yellowed, flooded or simply dead
  • Single-speed pump that runs loud and drives up the power bill
  • No way to change lights, heat or cleaning times without walking to the pad
  • Equipment that predates the pool’s last renovation
  • You want color lighting or scenes for evening use
Our process

What Eden does

1

Electrical and pad review

We verify bonding, grounding, GFCI protection and existing conduit before recommending fixtures or equipment.

2

Fixture and equipment selection

We match LED niches, pump sizing and any automation panel to your pool’s volume, features and how you actually use it.

3

Installation

Old fixtures and equipment come out, new units are installed and plumbed or wired to code.

4

Automation setup

Schedules, lighting scenes and heater setpoints are programmed and linked to the app.

5

Walkthrough

We run everything with you at night so you can see the lighting and know how to change it.

Good to know

Common questions

How long does it take?

A light swap is often same-day; a full equipment and automation upgrade usually takes one to three days.

How long do LED pool lights last?

Typically 15,000-30,000 hours—many years of normal evening use compared to a season or two for incandescent.

What affects the cost?

Number of fixtures, whether existing conduit can be reused, pump and heater sizing, and the automation tier you choose.

Related services

You may also need

Equipment pad

Equipment Repairs & Upgrades

Diagnosing and fixing what’s on the pad—and knowing when repairing costs more than upgrading.

Learn more
Circulation

Pumps, Filters & Pool Equipment

The circulation system that keeps water clear—right-sized pumps, the right filter type, and a schedule that actually turns the water over.

Learn more
Comfort & season

Pool Heaters

Heat pumps, gas heaters and solar—choosing, repairing and sizing the right one for a Southwest Florida pool.

Learn more
Let's talk about your pool

Ready to Build, Renovate or Repair?

Call Eden Custom Pools & Renovations to discuss your project and request an estimate.

239-321-9788